will it last?
Fewer surprises after commissioning. Before the machine left the factory, it had already run for several hours.
- Every boiler is made of AISI 316L stainless steel and hand-welded using the TIG method.
- A pressure test well above normal operating pressure, lasting several hours.
- Before shipping, the machine is assembled, switched on and runs for several hours. Sensors and pressure gauges are calibrated.
- Random re-testing of packed machines. The quality department: 16 product specialists and 2 system specialists, 285,000 parts inspected in the last year.
Boilers are welded by a team of 14. Welding a single boiler takes at least an hour.